Title: Nanning City Lighting Management Office Lighting Daily Maintenance and Repair Materials (including LED Light Sources) Procurement Announcement Tender No.: NNZC2009-1121A Announcement Date: June 17, 2009 Deadline: July 9, 2009 Tendering Agency: Nanning City Lighting Management Office Province: Guangxi Zhuang Autonomous Region... Content: Entrusted by Nanning City Lighting Management Office, Nanning Municipal Government Centralized Purchasing Center plans to open bidding for Nanning City Urban Lighting Management Office for daily lighting maintenance and repair materials procurement , the procurement information is now announced as follows:
I. Item No.: NNZC2009-1121A
Project Name: Nanning City Urban Lighting Management Office of the city's daily maintenance and repair materials procurement project budget: pick up thousands of pick up Lu Yuanwu angle (Â¥2801986.50 yuan)
Second, the project content:
※Reference model and specification
A subscript: 1, sodium bulb. 50.
2. Sodium bulbs. 4000.
3. Sodium bulbs. 800.
4, sodium bulbs. 50.
5, sodium bulbs. 100 pieces.
6, metal halide bulbs. 100 pieces.
7, energy-saving light bulbs. 300.
8, energy-saving light bulbs. 100 pieces.
9, sodium lamp ballast. 200 only.
10. AC contactor. 50 only.
11, the trigger. 1000 only.
12. Air switch. 10 only.
13, capacitors. 100 only.
14. National Jinzhu. 10 shots.
15, screw head. 120 only.
16, the work door triangle head rod. 300 capsules.
17, Luo rod. 1000 capsules.
18, Luo rod. 1000 capsules.
19, Luo rod. 1000 capsules.
20, Luo rod. 1000 capsules.
21, Luo rod. 1000 capsules.
22, Luo mother. 1000 capsules.
23, Luo mother. 2000 tablets.
24, Luo mother. 200 capsules.
25, Luo mother. 200 capsules.
26, Luo mother. 200 capsules.
27, square mat. 1000 capsules.
28, square pad. 1000 capsules.
29, round pad. 1000 capsules.
30, round pad. 1000 capsules.
31. Round pad. 1000 capsules.
32. Hand steel saw blade 300 pieces.
33. Galvanized iron wire. 100 Kg.
34. Galvanized iron wire. 500 Kg.
35, galvanized iron sheet. 20 m2
36. Copper wire ears. 300 only.
37. Copper wire ear. 500 only.
38.
Copper wire ear. 100 only.
39. Fuse. 100 laps.
40, fuse. 200 laps.
41. Tubular fuses. 500.
42. The universal box is changed to copper padlock. 50.
43. Core pull nails. 5000.
44, cable through the pipeline. 200 meters.
45, battery square. 50 capsules.
46. ​​Battery. 600 capsules.
47. Dongge Road courtyard lamp shade. 100 knots.
48. The fuse is inserted and removed. 10.
49. Triangular special wrench in the working door. 60.
50, flashlight LED light source charging type. 41.
51, electric pen. 60 pieces.
52, wire cutters. 60.
53, stripping pliers. 20.
54, needle-nosed pliers. 60.
55, plastic pliers. 60.
56, six-piece hex wrench. 20 sets.
57, adjustable wrench No. 8. 60.
58. The adjustable wrench has 30 bolts for large activities. 16
59, plum blossom wrench 32.27.24.19.17.14.12.10.8 each one. 19 sets.
60. One open end wrench 32.27.24.19.17.14.12.10.8. 19 sets.
61. Cross screwdriver. 60 sets.
62, a word screwdriver. 60 sets.
63, electrician knife. 60.
64, multimeter. 20.
65, clamp meter. 20.
66. Ground resistance test shake table. 1 set.
67. Insulation test shaker (Megohmmeter). 1 set.
68, sheathed wire. 8000 meters.
69. Sheath line. 8000 meters.
70, copper core wire. 7000 meters.
71. Copper core wire. 7100 meters.
72, copper core wire. 4000 meters.
73. Copper core wire. 1800 meters.
74, copper core wire. 1700 meters.
75, copper core cable. 900 meters.
76, copper core cable. 1000 meters.
77. Copper core cable. 1000 meters.
78. Copper core cable. 1000 meters.
... The specific technical parameters are detailed in the electronic tender. ------
B sub-standard: 1, metal halide lamp. 20 only.
2. Metal halide lamps. 10 only.
3, T5 lamp (set). 30 sets.
4, T5 lamp. 40.
5, T5 lamp. 70 pieces.
6, T5 tube. 200.
7, T5 tube. 80.
8, T5 tube. 80.
9, LED flood light. 20 pieces.
10, LED light board. 12 sets.
11, LED linear lights. 10 sticks.
12, LED linear lights. 25 pieces.
13, flat five-line rainbow tube (self-matching rectifier, power supply, controller). 10 sets.
14, LED column headlights. 400.
15, LED digital tube (running). 30 articles.
16, LED linear lights. 60 pieces.
17, LED linear lights. 60 pieces.
18, LED light board (seven colors). 8 sets.
19, LED light board (seven colors). 8 sets.
20, LED light board (color) 8 sets.
21, LED light board (seven colors). 8 sets.
22, LED light board (seven colors). 8 sets.
23, LED light board (seven colors). 8 sets.
24, LED light board (seven colors). 8 sets.
25, LED light board (seven colors). 8 sets.
26, LED light board (seven colors). 8 sets.
27, LED light board (seven colors). 8 sets.
28, LED light board (seven colors). 8 sets.
29, LED tube. 30.
30, 90 sets of LED light panels.
31. LED illuminating board. 8 blocks.
32. LED flood light. 8.
33, LED digital tube. 23 branches.
34, LED linear lights. 200.
35, LED light board. 30 blocks.
36, LED digital tube. 11 pieces.
37, LED lights. 3 sets.
38. LED linear light. 25 pieces.
39. LED linear light. 20 pieces.
40, LED linear light. 30.
41. LED linear light. 30.
42. LED linear light. 9 pieces.
43, LED linear lights. 9 pieces.
44, 9 LED linear lights.
45, LED linear lights. 9 pieces.
46, LED linear light. 9 pieces.
47 LED line light. 9 sets.
48.
LED line light. 9 pieces.
49.
Energy saving lamp. 330 only.
50, Xenon lights. 25 only.
51. Xenon lamp trigger. 20.
52, fan (large). 73.
53, fan (small). 22
54, gear motor. 25
55. Xenon reflector bowl. 11
56, power. 60.
57, LED light power supply. 5
58, LED light power supply. 50.
59. 6 LED power supplies.
60, LED power supply. 30.
61. LED power supply. 50.
62, LED power supply. 30.
63, LED light board power supply. 3 sets.
64, LED linear light power supply. 6 sets.
65, sub-control. 60.
66, the main controller. 3
67. LED light controller. 5
68, LED light master. 2
69, LED master control. 3
70, LED main controller. One.
71. LED main controller. One.
72. LED controller. 4.
73, LED sub-control. 12
74, LED sub-control. 12
75, LED sub-controller (including power supply). 5
76, LED digital tube master control. One.
77 LED sub-control. 2
78. Reed light LED controller. 3
79, LED lamp amplifier. 15
80, signal amplifier. Six.
※Technical parameters
81, LED signal amplifier. Six.
82, LED signal amplifier. 2
83, ballast (inductance). 10.
84, ballast (inductance). 15
85, ballast (electronic). 20 pieces.
86, ballast (electronic). 30.
87, ballast (electronic). 3000.
88, ballast (electronic). 2100.
89, T5 ballast (electronic). 100.
90, ballast (T8 lamp electronics). 50.
91, ballast (T8 lamp electronics). 50.
92, ballast (electronic). 20.
93, trigger. 20.
94, capacitor. 20.
95, submersible pump. 30 units.
96, copper drum light drum surface. 4 faces.
97, T5 tempered glass. 200 pieces.
98, lawn lamp shade A type. 15
99, lawn lamp shade B type. 15
100, lawn lamp shade C type. 15
101, porcelain lamp holder. 60 only.
102. Monitor terminal and relay station battery. 60 units.
03. Monitor the terminal. Suction cup antenna. 20 roots.
104, multimeter. One.
105, flashlight. 4 only.
106, big tongs. 4
107, needle-nosed pliers. 4
108, cutting pliers. 4
109, wire stripper. 4
110, electric iron. 4
111, open wrench. 4
112, open wrench. 4
113, 9 volt multimeter battery. 10 only.
114, plum wrench. 4
115, plum wrench. 4
116. Activity boarder. 4
... The specific technical parameters are detailed in the electronic tender.
The above manufacturer's model specifications are for reference only. The specific requirements are detailed in the procurement documents.
Third, supplier qualification requirements:
A manufacturer or agent who has the status of a domestic legal person and is registered to produce or sell the goods purchased in this tender.
Fourth, the tender / procurement documents release time: June 15, 2009 to July 08, 2009 (normal working hours, except holidays)
Venue: Central Government Procurement Center of Nanning City (808 Finance Room, 8th Floor, No. 59-1 Jinhu Road, Nanning City)
Price: Wu pick up yuan / share (Â¥ 50 yuan / share), not refundable after sale.
Method: If you need to mail the bid, please fax the copy of the wire to the unit name, the detailed address, the postal code, the item number of the purchase bid, the unit contact and the contact number.
V. Deadline for bidding:
Bid Opening Time: 09:00:00, 00:00, July 09, 2009 Bid Opening Location: Bid Opening Room, 7th Floor, Central Purchasing Center of Nanning Municipal Government (see the 7th floor electronic display for details)
Sixth, the purchaser's address: Nanning procurement agency account name: Nanning Municipal Government Centralized Purchasing Center Purchasing Agency Bank: China Construction Bank Nanning Jiabin Road Sub-branch Purchasing Agency Bank Account Company Name: Nanning Municipal Government Central Purchasing Center Contact : Shuai Yarong Tel: 0771-5555263 E-mail: Fax: Postal Code: Address: 59-1 Jinhu Road, Nanning City
I. Item No.: NNZC2009-1121A
Project Name: Nanning City Urban Lighting Management Office of the city's daily maintenance and repair materials procurement project budget: pick up thousands of pick up Lu Yuanwu angle (Â¥2801986.50 yuan)
Second, the project content:
※Reference model and specification
A subscript: 1, sodium bulb. 50.
2. Sodium bulbs. 4000.
3. Sodium bulbs. 800.
4, sodium bulbs. 50.
5, sodium bulbs. 100 pieces.
6, metal halide bulbs. 100 pieces.
7, energy-saving light bulbs. 300.
8, energy-saving light bulbs. 100 pieces.
9, sodium lamp ballast. 200 only.
10. AC contactor. 50 only.
11, the trigger. 1000 only.
12. Air switch. 10 only.
13, capacitors. 100 only.
14. National Jinzhu. 10 shots.
15, screw head. 120 only.
16, the work door triangle head rod. 300 capsules.
17, Luo rod. 1000 capsules.
18, Luo rod. 1000 capsules.
19, Luo rod. 1000 capsules.
20, Luo rod. 1000 capsules.
21, Luo rod. 1000 capsules.
22, Luo mother. 1000 capsules.
23, Luo mother. 2000 tablets.
24, Luo mother. 200 capsules.
25, Luo mother. 200 capsules.
26, Luo mother. 200 capsules.
27, square mat. 1000 capsules.
28, square pad. 1000 capsules.
29, round pad. 1000 capsules.
30, round pad. 1000 capsules.
31. Round pad. 1000 capsules.
32. Hand steel saw blade 300 pieces.
33. Galvanized iron wire. 100 Kg.
34. Galvanized iron wire. 500 Kg.
35, galvanized iron sheet. 20 m2
36. Copper wire ears. 300 only.
37. Copper wire ear. 500 only.
38.
Copper wire ear. 100 only.
39. Fuse. 100 laps.
40, fuse. 200 laps.
41. Tubular fuses. 500.
42. The universal box is changed to copper padlock. 50.
43. Core pull nails. 5000.
44, cable through the pipeline. 200 meters.
45, battery square. 50 capsules.
46. ​​Battery. 600 capsules.
47. Dongge Road courtyard lamp shade. 100 knots.
48. The fuse is inserted and removed. 10.
49. Triangular special wrench in the working door. 60.
50, flashlight LED light source charging type. 41.
51, electric pen. 60 pieces.
52, wire cutters. 60.
53, stripping pliers. 20.
54, needle-nosed pliers. 60.
55, plastic pliers. 60.
56, six-piece hex wrench. 20 sets.
57, adjustable wrench No. 8. 60.
58. The adjustable wrench has 30 bolts for large activities. 16
59, plum blossom wrench 32.27.24.19.17.14.12.10.8 each one. 19 sets.
60. One open end wrench 32.27.24.19.17.14.12.10.8. 19 sets.
61. Cross screwdriver. 60 sets.
62, a word screwdriver. 60 sets.
63, electrician knife. 60.
64, multimeter. 20.
65, clamp meter. 20.
66. Ground resistance test shake table. 1 set.
67. Insulation test shaker (Megohmmeter). 1 set.
68, sheathed wire. 8000 meters.
69. Sheath line. 8000 meters.
70, copper core wire. 7000 meters.
71. Copper core wire. 7100 meters.
72, copper core wire. 4000 meters.
73. Copper core wire. 1800 meters.
74, copper core wire. 1700 meters.
75, copper core cable. 900 meters.
76, copper core cable. 1000 meters.
77. Copper core cable. 1000 meters.
78. Copper core cable. 1000 meters.
... The specific technical parameters are detailed in the electronic tender. ------
B sub-standard: 1, metal halide lamp. 20 only.
2. Metal halide lamps. 10 only.
3, T5 lamp (set). 30 sets.
4, T5 lamp. 40.
5, T5 lamp. 70 pieces.
6, T5 tube. 200.
7, T5 tube. 80.
8, T5 tube. 80.
9, LED flood light. 20 pieces.
10, LED light board. 12 sets.
11, LED linear lights. 10 sticks.
12, LED linear lights. 25 pieces.
13, flat five-line rainbow tube (self-matching rectifier, power supply, controller). 10 sets.
14, LED column headlights. 400.
15, LED digital tube (running). 30 articles.
16, LED linear lights. 60 pieces.
17, LED linear lights. 60 pieces.
18, LED light board (seven colors). 8 sets.
19, LED light board (seven colors). 8 sets.
20, LED light board (color) 8 sets.
21, LED light board (seven colors). 8 sets.
22, LED light board (seven colors). 8 sets.
23, LED light board (seven colors). 8 sets.
24, LED light board (seven colors). 8 sets.
25, LED light board (seven colors). 8 sets.
26, LED light board (seven colors). 8 sets.
27, LED light board (seven colors). 8 sets.
28, LED light board (seven colors). 8 sets.
29, LED tube. 30.
30, 90 sets of LED light panels.
31. LED illuminating board. 8 blocks.
32. LED flood light. 8.
33, LED digital tube. 23 branches.
34, LED linear lights. 200.
35, LED light board. 30 blocks.
36, LED digital tube. 11 pieces.
37, LED lights. 3 sets.
38. LED linear light. 25 pieces.
39. LED linear light. 20 pieces.
40, LED linear light. 30.
41. LED linear light. 30.
42. LED linear light. 9 pieces.
43, LED linear lights. 9 pieces.
44, 9 LED linear lights.
45, LED linear lights. 9 pieces.
46, LED linear light. 9 pieces.
47 LED line light. 9 sets.
48.
LED line light. 9 pieces.
49.
Energy saving lamp. 330 only.
50, Xenon lights. 25 only.
51. Xenon lamp trigger. 20.
52, fan (large). 73.
53, fan (small). 22
54, gear motor. 25
55. Xenon reflector bowl. 11
56, power. 60.
57, LED light power supply. 5
58, LED light power supply. 50.
59. 6 LED power supplies.
60, LED power supply. 30.
61. LED power supply. 50.
62, LED power supply. 30.
63, LED light board power supply. 3 sets.
64, LED linear light power supply. 6 sets.
65, sub-control. 60.
66, the main controller. 3
67. LED light controller. 5
68, LED light master. 2
69, LED master control. 3
70, LED main controller. One.
71. LED main controller. One.
72. LED controller. 4.
73, LED sub-control. 12
74, LED sub-control. 12
75, LED sub-controller (including power supply). 5
76, LED digital tube master control. One.
77 LED sub-control. 2
78. Reed light LED controller. 3
79, LED lamp amplifier. 15
80, signal amplifier. Six.
※Technical parameters
81, LED signal amplifier. Six.
82, LED signal amplifier. 2
83, ballast (inductance). 10.
84, ballast (inductance). 15
85, ballast (electronic). 20 pieces.
86, ballast (electronic). 30.
87, ballast (electronic). 3000.
88, ballast (electronic). 2100.
89, T5 ballast (electronic). 100.
90, ballast (T8 lamp electronics). 50.
91, ballast (T8 lamp electronics). 50.
92, ballast (electronic). 20.
93, trigger. 20.
94, capacitor. 20.
95, submersible pump. 30 units.
96, copper drum light drum surface. 4 faces.
97, T5 tempered glass. 200 pieces.
98, lawn lamp shade A type. 15
99, lawn lamp shade B type. 15
100, lawn lamp shade C type. 15
101, porcelain lamp holder. 60 only.
102. Monitor terminal and relay station battery. 60 units.
03. Monitor the terminal. Suction cup antenna. 20 roots.
104, multimeter. One.
105, flashlight. 4 only.
106, big tongs. 4
107, needle-nosed pliers. 4
108, cutting pliers. 4
109, wire stripper. 4
110, electric iron. 4
111, open wrench. 4
112, open wrench. 4
113, 9 volt multimeter battery. 10 only.
114, plum wrench. 4
115, plum wrench. 4
116. Activity boarder. 4
... The specific technical parameters are detailed in the electronic tender.
The above manufacturer's model specifications are for reference only. The specific requirements are detailed in the procurement documents.
Third, supplier qualification requirements:
A manufacturer or agent who has the status of a domestic legal person and is registered to produce or sell the goods purchased in this tender.
Fourth, the tender / procurement documents release time: June 15, 2009 to July 08, 2009 (normal working hours, except holidays)
Venue: Central Government Procurement Center of Nanning City (808 Finance Room, 8th Floor, No. 59-1 Jinhu Road, Nanning City)
Price: Wu pick up yuan / share (Â¥ 50 yuan / share), not refundable after sale.
Method: If you need to mail the bid, please fax the copy of the wire to the unit name, the detailed address, the postal code, the item number of the purchase bid, the unit contact and the contact number.
V. Deadline for bidding:
Bid Opening Time: 09:00:00, 00:00, July 09, 2009 Bid Opening Location: Bid Opening Room, 7th Floor, Central Purchasing Center of Nanning Municipal Government (see the 7th floor electronic display for details)
Sixth, the purchaser's address: Nanning procurement agency account name: Nanning Municipal Government Centralized Purchasing Center Purchasing Agency Bank: China Construction Bank Nanning Jiabin Road Sub-branch Purchasing Agency Bank Account Company Name: Nanning Municipal Government Central Purchasing Center Contact : Shuai Yarong Tel: 0771-5555263 E-mail: Fax: Postal Code: Address: 59-1 Jinhu Road, Nanning City

Cbd Vape Products Oem,D8 Vape Pen Oem,Cbd Disposable Vape Pen Oem,China Cbd Vape Products Oem
Shenzhen MASON VAP Technology Co., Ltd. , https://www.masonvap.com